http://JUDIS.NIC.IN
SUPREME COURT OF INDIA
technical reports and other information relating to safety of the Tehri Dam
and make its recommendations to the Government for consideration. In the
selection of the experts Shri Sandra Bahuguna, who has been spearheading
the movement against the construction of the Tehri Dam, was also associated
and he recommended the inclusion of two engineers apart from the three
seismologist. Thus the names of all the five Experts were suggested by Shri
Bahuguna. The Group of Five Experts, after a detailed discussion on the
various issues related to the seismic safety of the Tehri Dam, concluded
that a comprehensive appraisal of the seismic safety of the dam required
completion of the two key exercises by employing recent advances in
conceptual and computational capabilities and they are, (i) quantitative
estimation of seismic hazard at all the Tehri Dam site, and (ii) evaluation
of the performance of the Tehri Dam as currently designed, if it was
exposed to the estimated seismic hazard at the site. Accordingly, the Group
of Experts got conducted the necessary exercises at their own decided
parameters and methods. The Group also considered the International
Commission on Large Dams Guidelines on Earthquake Analysis Procedure for
Dams and Seismicity and Dam Design. Based on these materials the Group of
Experts finally submitted the report on 18.2.1998. They concluded that the
"present design of the Dam is expected to be structurally safe to withstand
the maximum credible earthquake during the economic performance life of the
dam-reservoir system." The Group of Experts was unanimous in their
recommendation as stated above. However, as a matter of abundant caution,
four Experts suggested (i) 3-D Non-Linear analysis of the Dam to evaluate
its performance against the maximum credible earthquake and (ii) a
simulated dam break analysis to ensure that in the unlikely event of an
uncontrolled release of water, the consequences are minimum, be conducted.
There was difference of opinion between the four Experts and the Fifth
Expert only on the need to undertake these two additional studies as a
matter of abundant caution. The Government of India, after receipt of the
report of the Group of Experts, examined the further recommendation of the
four out of five Experts in consultation with the Central Water Commission,
which is a technical body of the Government and nodal agency in the country
for planning and design of River Valley Projects who in turn referred the
report of the Expert Group together with the need for carrying out the work
recommended by way of abundant caution to the National Committee on Seismic
Design Parameters which is a standing technical committee and it furnished
its views. In addition, plethora of material has been placed by way of
various text books and studies carried out by other agencies. We think that
it is neither feasible nor proper for us to delve into these details. The
Government of India, after considering the views thereof, finally decided
that there was no necessity to undertake the work recommended further by
the Four Experts by way of abundant caution and clearance to the project
was given.
In Tehri Bandh Virodhi Sangarsh Samiti vs. State of UP, [1992] Supp. 1 SCC
44, the grant of clearance on July 19, 1990 was called in question before
this Court in a writ petition and this Court examined the safety aspects
which were brought to the notice of the court and it was held that the
clearance given was not as a result of non-application of mind by the
Government on safety and environmental aspects and it was particularly
examined with reference to the fact that site of the project is being
within the earthquake prone zone and this Court, after specific examination
of the record observed that the project was considered by the Environmental
Appraisal Committee of MoEF, Committee of Secretaries, High Level Committee
comprising experts of scientific and specialised organisations and also by
a renowned expert of international repute and, therefore, the Government
considered the question of safety of the project from various details more
than once and on being satisfied with the reports of the experts gave
clearance to the project. In those circumstances, this Court thought fit
not to interfere with the same.
This Court dealt with the safety concerns and held that :
"...In our opinion the Court can only investigate and adjudicate the
Page 5 of 37